Pyro Industries Quest Plus Instruções de Operação Página 17

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 40
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 16
Stove lnstalla tion Assembly
Your Whitfield Quest Plus May Be Installed As:
A
freestanding unit with a pedestal placed on a noncombustible floor pad.
A mobile home heater placed on a non-combustible floor pad, with a source of outside air, bolted
down and electrically grounded to the chassis of the home.
Floor Protection
Your Whitfield pellet stove must be
installed on a non-combustible protec-
tive floor pad of minimum
318" thick-
ness material or a masonry hearth. The
hearth or floor pad must extend a min-
imum of
6"
in front of and from each
side of the stove or to the nearest per-
mitted combustible material if less
than
6".
Floor/Hearth Pad
Clearances to
Combustibles
The following minimum clear-
ances to combustible materials
must be maintained. Keep all
combustibles at least 18" (hori-
zontally) away from the glass
windows.
(ALCOVE CLEARANCES)
Maximum Alcove depth: 24".
Minimum Alcove height:
47-112"
Minimum Alcove Width: 37"
-
-
-.
---
Combustible Wall
=
I"
2
n
n
2
g
3
1"
I
4-
5
~
Li
,
I
4
I
I
1
I
I
Vista de página 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 39 40

Comentários a estes Manuais

Sem comentários