Pyro Industries Advantage Plus Instruções de Operação Página 23

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 37
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 22
Mobile Home Installation
MOBILE HOME EXHAUST VENT PIPE INSTALLATION GUIDELINES
Use only listed type “L pellet vent pipe. Pipe should extend at least 3 feet above the part of the roof
through which it passes. The top of the pipe should be at least 2 feet above the highest required ele-
vation of any part of the mobile home within 10 feet of the pipe.
If exhaust vent exits the mobile home at a location other than the roof, and exits at a point 7 feet or
less above the ground level on which the mobile home is position a guard or method of enclosing
the pipe shall be provided at the point of exit for a height of up to 7 feet. The openings, if any, in this
guard shall not allow a 3/4”rod to pass through. A 1/2”rod could pass through but should not be
able to touch the pipe when inserted through the opening a distance of 4 inches.
Bolt
Non-combustible
Floor Pad
Floor
Chassis
IN ADDITION TO THE STANDARD INSTALLATION INSTRUCTIONS, THE FOLLOWING INSTRUCTIONS MAY BE
REQUIRED BY LOCAL, STATE OR FEDERAL BUILDING CODES:
Stove must be permanently bolted to the floor.
Stove must have a permanent outside air source.
Stove must be permanently electrically grounded to the steel chassis of the home. The location selected
for ground attachment to the stove must be dedicated for this purpose.
Refer to page 17 for list of commonly used vent components.
NOTE: THE GROUNDING OF THIS PRODUCT, AT INSTALLATION, MUST COMPLY WITH NFPA-70
STANDARDS, CSA C22.1 IN CANADA,AS WELL AS ANY LOCAL CODES.
WARNING:
DO NOT INSTALL IN A SPACE USED AS A BEDROOM.
CAUTION:THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR, WALL
AND CEILING/ROOF MUST BE MAINTAINED.
Vista de página 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 36 37

Comentários a estes Manuais

Sem comentários